CONSTRUCTIONS

Main Contractor and or Sub-Contractor

 List of the projects | Certificates | Siam camp | Pictures 

Main Contractor and or Sub-Contractor

  • Civil Construction Project
  • Road, Bridge, Dam, Airbase Project
  • Condominium, Apartment, Building
  • Railway and Station Building Project
  • Architect, Engineering, Consultant Services
  • Construction Management Consultant
  • Manpower Force Management Control
  • International Investment Consultant

 Company  Slogan

  • Honesty & Punctuality
  • Excellent team work
  • Reliable contractor
  • Excellent coordinator
  • Minimize your expenses
  • Caring on every stage of work

LIST OF THE PROJECTS

NAME LIST WITH DETAILS OF CIVIL CONSTRUCTION PROJECTS PREVIOUSLY AND RECENTLY COMPLETED.

AS MAIN CONTRACTOR AND/OR SUB-CONTRACTOR & SERVICES CONTRACTOR ON THAI MANPOWER FORCE EXECUTED BY THE PRINCIPAL MANAGEMENT TEAM OF SIAM & AWARD REPUBLIC AGENCY LTD BANGKOK, THAILAND AND CO-OPERATED WITH PANACOTA-BAHRAIN.

 

1.  BAHRAIN SAUDI ARABIA CAUSEWAY PROJECT, AFTER CALLED ″ KING FAHAD CAUSEWAY″

CAUSEWAY OPENED ON 16TH DECEMBER, 1987 AT THE CAUSEWAY BAHRAIN SIDE.

* MAIN CONTRACTOR: BALLAST NEDAM GROEP N.V.

SUB-CONTRACTOR : MANAGED BY THE PRINCIPAL MANAGEMENT TEAM UNDER THE CHAIRMANSHIP OF MR. CHAN PHENJAVONG(DAVID). THE PROJECT UNDERTAKEN AS SERVICES CONTRACTOR ON THAI MANPOWER FORCE, STEEL FIXING, SHUTTERING, CONCRETING WORKS START FROM NOVEMBER, 1982 AND COMPLETED NOVEMBER, 1987. THE MAINTENANCE PERIOD WAS FROM 1987 TO END OF DECEMBER, 1988.

 

2.  MANAMA - MUHARRAQ BRIDGE PROJECT AT MANAMA, BAHRAIN

* MAIN CONTRACTOR : HAJI HASSAN BRIMS CO. W.L.L.

SUB-CONTRACTOR : MANAGED BY THE PRINCIPAL MANAGEMENT TEAM UNDER THE CHAIRMANSHIP OF MR. CHAN PHENJAVONG (DAVID). THE PROJECT MASONRY BRICK WORKS JOBS STARTED FROM JUNE 1983 TO END OF DECEMBER, 1983.

 

3. COLLEGE OF MEDICINE AND MEDICAL SCIENES PROJECT, MANAMA, BAHRAIN.

* MAIN CONTRACTOR : BAHRAIN SAINRAPT CONTRACTING CO. W.L.L.

SUB - CONTRACTOR : MANAGED BY THE PRINCIPAL MANAGEMENT TEAM

UNDER THE CHAIRMANSHIP OF MR. CHAN PHANJAVONG (DAVID). MAIN JOB WAS STEEL FIXING, CARPENTRY & SHUTTERING WITH MASONRY WORKS. JOB STARTED FROM AUGUST, 1983 TO FEBRUARY, 1984.

 

4. ARAB IRON & STEEL CO. PROJECT FOR (BAHRAIN PELLESTIZING PLANT) HIDD, BAHRAIN.

* MAIN CONTRACTOR: BALFOUR BEATTY CONSTRUCTION LIMITED.

(INTERNAL CONSTRUCTION DIVISION).

SUB-CONTRACTOR : MANAGED BY THE PRINCIPAL MANAGEMENT TEAM UNDER THE CHAIRMANSHIP OF MR. CHAN PHENJAVONG (DAVID). PROJECT STARTED FROM FEBRUARY, 1984 TO APRIL, 1985.

 

5. BROWN & ROOT COMPLEX PROJECT AT SITRA, BAHRAIN.

* MAIN CONTRACTOR: M & I CONSTRUCTION W.L.L.

SUB - CONTRACTOR : MANAGED BY THE PRINCIPAL MANAGEMENT TEAM UNDER THE CHAIRMANSHIP OF MR. CHAN PHENJAVONG (DAVID). UNDERTAKEN THE FULL CONSTRUCTION OF BUILDING BLOCKWORKS, PLASTERING AND SHUTTERING WORKS TO COMPLETE THE WHOLE COMPLEX. JOB STARTED APRIL, 1984 TO DECEMBER, 1984.

 

6. FAKHRO COMMERCIAL COMPLEX PROJECT AT GUDHABIA, MANAMA, BAHRAIN.

* MAIN CONTRACTOR : SUMER ENGINEERING & CONTRACTING CO. W.L.L.

SUB-CONTRACTOR : MANAGED BY THE PRINCIPAL MANAGEMENT TEAM UNDER THE CHAIRMANSHIP OF MR. CHAN PHENJAVONG (DAVID) . PROJECT STARTED FROM MARCH, 1984 TO AUGUST, 1985 AND CIVIL CONSTRUCTION RESPONSIBLE TO CONSTRUCT THE ENTIRE BUILDING STRUCTURE FROM THE FOUNDATION, BEAM, COLUMNS TO THE ROOF OF THE COMPLEX.

 

7. BADAR AL DAR COAST GUARD BASE PROJECT, AT SITRA, BAHRAIN.

* MAIN CONTRACTOR: G. P. ZACHARIADES (OVERSEAS) LTD.

SUB-CONTRACTOR : MANAGED BY THE PRINCIPAL MANAGEMENT TEAM UNDER THE CHAIRMANSHIP OF MR. CHAN PHENJAVONG (DAVID). CIVIL CONSTRUCTION AMOUNT AS LUMPSUM RESPONSIBLE TO CONSTRUCT THE STRUCTURE & FINISHING JOB, JUNE, 1984 TO MAY , 1985.

 

8. HAJI HASSAN BIN ALI AL-A′ALI BUILDING PROJECT, AT MANAMA, BAHRAIN

* MAIN CONTRACTOR: HAJI HASSAN BIN ALI AL-A′ ALI CO.

SUB-CONTRACTOR : MANAGED BY THE PRINCIPAL MANAGEMENT TEAM UNDER THE CHAIRMANSHIP OF MR. CHAN PHENJAVONG (DAVID). PROJECT RESPONSIBLE FOR ALUMINIUM WINDOW FIXING. JOB STARTED FROM JANUARY, 1985 TO JUNE, 1985.

 

9. ARABIAN GULF UNIVERSITY PROJECT. STATE OF BAHRAIN.

* MAIN CONTRACTOR: RET-SER ENGINEERINT AGENCY & AL HABTOOR LEIGHTON

SUB-CONTRACTOR : MANAGED BY THE PRINCIPAL MANAGEMENT TEAM UNDER THE CHAIRMANSHIP OF MR. CHAN PHENJAVONG(DAVID). PROJECT RESPONSIBLE FOR STEEL WORKS, SHUTTERING AND CONCRETING. JOB STARTED FROM MAY, 1984 TO NOVEMBER, 1985.

 

10. SUMAN MILITARY AIR BASE PROJECT. AFTER CALLED ″ SHAIKH ISA AIRBASE ″ STATE OF BAHRAIN.

* MAIN CONTRACTOR: RET-SER ENGINEERING AGENCY

SUB-CONTRACTOR : PAN ARAB CONTRACTING & TRADING AGENCIES(PANACOTA) UNDER THE IRECT SUPERVISION OF THE PRINCIPAL MANAGEMENT TEAM, AND WITH ALL THE THAI CIVIL CONSTRUCTION FOREMEN & ALL BRICKLAYERS, WORKERS FOR WHICH UNDER THE CHAIRMANSHIP OF MR. CHAN PHENJAVONG (DAVID). THE CHAIRMAN & MANAGING DIRECTOR OF SIAM & AWARD REPUBLIC AGENCY LTD.

* PROJECT RESPONSIBILITY: WE STARTED THE MOBILIZATION FROM JUNE 1987 TO THE END OF 1987 AND STARTED THE MAIN CONSTRUCTION SUCH AS FOUNDATION, BEAM, COLUMNS AND THE WHOLE STRUCTURE OF ALL THE BUILDING, STEEL WORKS, CARPENTRY & SHUTTERING WORKS, CONCRETING, BLOCK WORKS, PLASTERING ETC. AND COMPLETED THE SUB-CONTRACTOR′S OBLIGATION UNTIL THE PROJECT COMPLETED ON 30TH  APRIL, 1991.

 

11. UMM SALEYM COMPOUND PROJECT (AL HAMALA BEACH EST.) STATE OF BAHRAIN.

* MAIN CONTRACTOR AS FOR THE MAINTENANCE JOB: PAN ARAB CONTRACTING & TRADING AGENCIES (PANACOTA). MANAGED BY THE PRINCIPAL MANAGEMENT TEAM, UNDER THE CHAIRMANSHIP OF MR. CHAN PHENJAVONG (DAVID). MAINTENANCE PERIOD STARTED FROM MAY, 1988 TO MAY, 1989.

 

12. BDF MILITARY HOSPITAL PROJECT, AT RIFFA, STATE OF BAHRAIN.

* MAIN CONTRACTOR: G.P. ZACHARIADES (OVERSES) LTD.

SUB-CONTRACTOR : PAN ARAB CONTRACTONG & TRADING AGENCIES (PANACOTA) UNDER THE DIRECT SUPERVISION OF THE PRINCIPAL MANAGEMENT TEAM AND WITH THE CIVIL TRADE FOREMEN & CARPENTER, FOR WHICH UNDER THE CHAIRMANSHIP OF MR. CHAN PHENJAVONG(DAVID). PROJECT RESPONSIBLE FOR STEEL STRUCTURE, SHUTTERING & CONCRETE WORKS. JOB STARTED FROM MARCH, 1990 TO OCTOBER, 1990.

 

We, certified the above mentioned information are true, and its copy from the documents are kept with our organization such as, Agreements, contracts, certification letter or recommendation letter from our main contractors.

 

Top

 

..........................................................................................................................................

 

CERTIFICATE                                                                                                                                           

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

Top

..........................................................................................................................................


 

SIAM CAMP MANAGMENT 

 

Siam Camp Management Services

 

Besides providing a work force having a high level of capability and productivity, we also undertake assignments of Camp Management Services at Employer’s job site. This responsibility is divided into three major phases:

a) FOOD/CATERING SERVICES

b) HOUSE-KEEPING FACILITIES

c) CAMP MANAGEMENT

These are all carried out by us in our effort to guarantee the best possible conditions for workers and economy for the Employer.

 

Food/Catering Services

 

We purchase at our cost all eatable items such as meat, vegetables, cooking fat, poultry etc. from the local market and serve the following meals to the employees living in the camp: Special ingredients required for Thai food are despatch from

Thailand.

a) BREAKFAST

b) LUNCH

c) DINNER

All the meals are provided as per menu agreed with the Employer, excluding cold drinks and juice etc. Food serving time is arranged as per Employer’s schedule.

 

House-Keeping Facilities

 

a) Cleaning and Sanitation of the whole Camp area, bed rooms of staff living in Camp, their toilets, bath rooms, dining hall, kitchen, store, rest rooms etc. and disposal of garbage from Camp area.

b) Changing of linen in the bed rooms and other areas of service in the camp.

c) Laundry Services to wash all the official linen provided by the Employer to its staff living in the camp, such as bed-sheets, pillow covers, towels and uniforms etc.

 

Camp Management

 

Our exclusive staff such as Administrators, Clerks, Cooks, Helpers, Drivers, Watchman, Sweepers, Laborers, House Boys etc. brought from Thailand manage during non-working hours the following in addition to the food/Catering Services and House-keeping jobs:

a) Looking after the day to day problems of the workers living in the camp.

b) Maintaining high standards of job performance throughout the duration of the project.

c) Maintaining high level of employee morale among all categories of labor.

d) Maintaining cordial and harmonious relations between the various clans and labor categories employed on the site.

e) Transportation of workers from Camp to job site and back as per Employer’s schedule. Also transport facilities from Camp to Down Town a few times a week as suggested by the Employer.

f) Deputing some of our staff to look after local government affairs such as visas, residence permits, driving licenses, and work in concerned Government Departments regarding the workers stay in the country of employment. This work is headed by a local Gentleman who knows the local language and is hired locally, to keep Public Relations in respective Government Departments.

g) Preparing/Obtaining air tickets from airline offices (ticket on Employer’s cost) and transporting personnel to airport for departure to their country of origin as per Employer’s schedule.

h) First Aid Medical Facilities at the Camp.

 

Top

 

..........................................................................................................................................

 

PICTURES

 

Pan Arab Contracting Company in The Kingdom of Bahrain and Transportation Team 

 

 

 

 Bahrain and Saudi Causeway Project 1980-1987 To end November 1991

 

 

 

 Condominium Building in Jilong Taipei, Taiwan R.O.C. 1994-1995

 

 

 

 Underground Car Park Project at Taipei Metropolis, Taiwan  R.O.C  August 1995-1997

 

 

 

 Commercial Building & Garden Villa Projects In Vientiane Lao P.D.R during 2008 - December 2010

 